Stockwool wins planning for 10 Whitechapel homes

A derelict and neglected site within a conversation area in Whitechapel will be transformed into a sensitive scheme of 10 homes, following the London Borough of Tower Hamlets granting planning permission for our scheme for E1 Homes.

 

Our plans for the site at 62-66 Cavell Street will create 10 high-quality one, two and three-bedroom homes, each with private amenity space in the form of roof terraces and recessed balconies.

The scheme will not only deliver housing of the highest quality, but also make a positive contribution to the conservation area by revitalising a vacant site with a context-led design which completes an existing urban block in a considered and contemporary manner.

The subtle palette of materials gives nothing of the technical complexity of the project away: the building will sit above a London Overground tunnel, using a steel cantilevered structure to support it.

Construction is due to start in summer this year.

 

  • 3383_PL(20)4_03 South Elevation Detail
  • 3383_PL(20)4_01 Cavell Street Elevation Detail
  • Cavell-web

Stockwool wins planning for 10 Whitechapel homes

A derelict and neglected site within a conversation area in Whitechapel will be transformed into a sensitive scheme of 10 homes, following the London Borough of Tower Hamlets granting planning permission for our scheme for E1 Homes.

 

Our plans for the site at 62-66 Cavell Street will create 10 high-quality one, two and three-bedroom homes, each with private amenity space in the form of roof terraces and recessed balconies.

The scheme will not only deliver housing of the highest quality, but also make a positive contribution to the conservation area by revitalising a vacant site with a context-led design which completes an existing urban block in a considered and contemporary manner.

The subtle palette of materials gives nothing of the technical complexity of the project away: the building will sit above a London Overground tunnel, using a steel cantilevered structure to support it.

Construction is due to start in summer this year.

 

  • 3383_PL(20)4_03 South Elevation Detail
  • 3383_PL(20)4_01 Cavell Street Elevation Detail
  • Cavell-web